AS/NZS 1170.1:2002 (R2016) Structural Design Actions - Permanent, imposed and other actions

Abbreviation
AS/NZS 1170.1:2002
Amendment
A1 - incorporated. Published 27/04/2005, A2 - incorporated. Published 20/01/2009.
Valid from
3/06/2002

Information provider
Standards New Zealand,
Author
Standards New Zealand, Standards Australia
Information type
New Zealand Standard,
Format
PDF, HARD COPY,


Description

This Standard provides design values of permanent, imposed and other actions to be used in the limit state design of structures and members. It is intended to be used in conjunction with AS/NZS 1170.0.

Other actions covered include liquid pressure, ground water, rain water ponding and earth pressure.

Scope

This Standard specifies permanent, imposed, static liquid pressure, ground water, rainwater ponding and earth pressure actions to be used in the limit state design of structures and parts of structures.

For assistance with locating previous versions, please contact the information provider.
View on Information Provider website
For assistance with locating previous versions, please contact the information provider.
This resource is cited by:

AS/NZS 1170.1:2002 (R2016) Structural Design Actions - Permanent, imposed and other actions

This document is CITED BY:

AS/NZS 1170.1:2002 (R2016) Structural Design Actions - Permanent, imposed and other actions

Description

This Standard provides design values of permanent, imposed and other actions to be used in the limit state design of structures and members. It is intended to be used in conjunction with AS/NZS 1170.0.

Other actions covered include liquid pressure, ground water, rain water ponding and earth pressure.

View on Information Provider website
AS/NZS 1170.1:2002 (R2016) Structural Design Actions - Permanent, imposed and other actions
Description

This Standard provides design values of permanent, imposed and other actions to be used in the limit state design of structures and members. It is intended to be used in conjunction with AS/NZS 1170.0.

Other actions covered include liquid pressure, ground water, rain water ponding and earth pressure.

View on Information Provider website
This resource cites:

AS/NZS 1170.1:2002 (R2016) Structural Design Actions - Permanent, imposed and other actions

This document CITES:
Feedback