Acceptable Solution E1/AS1: Surface Water

This resource is no longer current. The current versions are E1/AS1 (Amd 11) (First Edition, Amendment 11.), E1/AS1 (Amd 12) (First Edition, Amendment 12.), E1/AS2 (First Edition, incorporated in Amd 11) (First Edition, included in Amendment 11), E1/AS2 (Amd 1, incorporated in Amd 12) (First Edition, Amendment 1 incorporated in Amd 12.)

Abbreviation
E1/AS1 (Amd 10)
Amendment
10
Version
First Edition, Amendment 10
Valid to
3/11/2021
Valid from
1/01/2017

Information provider
Ministry of Business, Innovation and Employment
Information type
Acceptable Solution
Format
PDF


Description

Acceptable Solution E1/AS1 provides a means of compliance with Building Code Clause E1 Surface Water. Building Code Clause E1 ensures that the disposal of rainwater from external surfaces and confirmation surface water cannot enter the building.

It requires buildings and site work to be constructed to protect people and other property from the adverse effects of surface water. It sets out performance requirements to ensure drainage systems are in place for the disposal of surface water using gravity where possible, and to avoid blockages and leakage.

Scope

This Acceptable Solution is limited to buildings and sitework having a catchment area of no more than 0.25 hectares and which are:

  • a) Free from a history of flooding,
  • b) Not adjacent to a watercourse, c) Not located in low lying area, and
  • d) Not located in a secondary flow path.
For assistance with locating previous versions, please contact the information provider.
This resource is cited by:

Acceptable Solution E1/AS1: Surface Water

This document is CITED BY:

Acceptable Solution E1/AS1: Surface Water

Description

Acceptable Solution E1/AS1 provides a means of compliance with Building Code Clause E1 Surface Water. Building Code Clause E1 ensures that the disposal of rainwater from external surfaces and confirmation surface water cannot enter the building.

It requires buildings and site work to be constructed to protect people and other property from the adverse effects of surface water. It sets out performance requirements to ensure drainage systems are in place for the disposal of surface water using gravity where possible, and to avoid blockages and leakage.

View on Information Provider website Download this resource (PDF, 1.6MB)
Acceptable Solution E1/AS1: Surface Water

This resource is no longer current. The current versions are E1/AS1 (Amd 11) (First Edition, Amendment 11.), E1/AS1 (Amd 12) (First Edition, Amendment 12.), E1/AS2 (First Edition, incorporated in Amd 11) (First Edition, included in Amendment 11), E1/AS2 (Amd 1, incorporated in Amd 12) (First Edition, Amendment 1 incorporated in Amd 12.)

Description

Acceptable Solution E1/AS1 provides a means of compliance with Building Code Clause E1 Surface Water. Building Code Clause E1 ensures that the disposal of rainwater from external surfaces and confirmation surface water cannot enter the building.

It requires buildings and site work to be constructed to protect people and other property from the adverse effects of surface water. It sets out performance requirements to ensure drainage systems are in place for the disposal of surface water using gravity where possible, and to avoid blockages and leakage.

View on Information Provider website Download this resource (PDF, 1.6MB)
This resource cites:

Acceptable Solution E1/AS1: Surface Water

This document CITES:
New Zealand Standards
Australian Standards
Other
Feedback