(https://www.mbie.govt.nz/)
(https://www.building.govt.nz/) (https://www.standards.govt.nz/) (https://www.branz.co.nz/)
Resource detail (https://codehub.building.govt.nz/resources/h1vm1-fifth-edition#resource-detail)
Citations (https://codehub.building.govt.nz/resources/h1vm1-fifth-edition#resource-citations)

Verification Method H1/VM1: Energy efficiency for all housing, and buildings up to 300 m².

View on Information Provider website Download this resource (PDF, 1.4MB) (https://www.building.govt.nz/assets/Uploads/building-code-compliance/h1-energy-efficiency/asvm/h1-energy-efficiency-vm1-5th-edition.pdf)

This resource is no longer current. H1/VM1 (Fifth edition, Amd 1) (Fifth edition, Amendment 1) (https://codehub.building.govt.nz/resources/h1vm1-fifth-edition-amd-1),

Abbreviation
H1/VM1 (Fifth edition)
Version
Fifth edition, unamended
Valid to
4/08/2022
Valid from
29/11/2021

Information provider
Ministry of Business, Innovation and Employment,
Information type
Verification Method,
Format
PDF,


Description

Verification Method H1/VM1 provides a means of compliance with Building Code Clause H1 Energy Efficiency.

Verification Method H1/VM1 applies to:

  • a) housing; and
  • b) other buildings with a floor area of occupied space no greater than 300 m², that are communal residential, communal non-residential (assembly care only) and commercial buildings.

For buildings that do not meet these characteristics, refer to the Acceptable Solution H1/AS2 or Verification Method H1/VM2 as a means to demonstrate compliance or use an alternative means to demonstrate compliance.

Scope

The Verification Method H1/VM1 does not include:

  • the use of foil insulation,
  • requirements to comply with Building Code clauses H.1.3.1(b), H1.3.4, H1.3.5 or H1.3.6. For these clauses, use an alternative means to demonstrate compliance.
Previous versions:
H1/VM1 (Amd 4) (Fourth edition, Amendment 4) (https://codehub.building.govt.nz/resources/h1vm1-amd-4)
H1/VM1 (Fourth edition, amendment 3) (https://codehub.building.govt.nz/resources/h1vm1-amd-3)
H1/VM1 (Third Edition, Amendment 2) (https://codehub.building.govt.nz/resources/h1vm1-amd-2)
H1/VM1 (Third Edition (unamended)) (https://codehub.building.govt.nz/resources/h1vm1)
For assistance with locating previous versions, please contact the information provider.
Notes/comments

This Verification Method is the fifth edition of H1/VM1. The main changes from the previous version are:

  • The scope of H1/VM1 has been reduced to cover only housing and buildings less than 300 m². Requirements
    applicable for large buildings have been combined into the new Verification Method H1/VM2. To reflect the new scope of the documents and the new document layout, a new introduction and scope has been provided in Part 1. General.
  • Citation of NZS 4218: 2009 has been removed from the document. The relevant content from this standard has been adopted into H1/AS1 with permission from Standards New Zealand.
  • The three-zone climate zone map previously found in NZS 4218 has been updated with a six-zone climate zone map in Appendix C.
  • The minimum R-values previously found in NZS 4218 are replaced with new values and new text in Part 2. Building thermal envelope.
  • References have been revised to include only documents within the scope of H1/AS1 and have been amended to include the most recent versions of NZS 4246 and ALF in Appendix A.
  • Additional references have been added to include BS EN 673, ISO 10077-1 and -2, ISO 10211, ISO 10456, ISO 12631, ISO 13370, and ISO 13789 in Appendix A.
  • The definitions page has been revised to include all defined terms used in this document in Appendix B.
  • The computer modelling method for determining the building energy use has been provided in Appendix D.
  • A new procedure for calculating the construction R-value of slab-on-ground floors has been added in Appendix F.

H1/VM1 (Fifth Edition) will be valid till August 2022, then will be replaced with H1/VM1 (Fifth Edition, Amd 1).

View on Information Provider website Download this resource (PDF, 1.4MB) (https://www.building.govt.nz/assets/Uploads/building-code-compliance/h1-energy-efficiency/asvm/h1-energy-efficiency-vm1-5th-edition.pdf)
H1/VM1 (Amd 4) Amendment 4 Fourth edition, Amendment 4 (https://codehub.building.govt.nz/resources/h1vm1-amd-4)
H1/VM1 Amendment 3 Fourth edition, amendment 3 (https://codehub.building.govt.nz/resources/h1vm1-amd-3)
H1/VM1 Amendment 2 Third Edition, Amendment 2 (https://codehub.building.govt.nz/resources/h1vm1-amd-2)
H1/VM1 Third Edition (unamended) (https://codehub.building.govt.nz/resources/h1vm1)
For assistance with locating previous versions, please contact the information provider.

This Verification Method is the fifth edition of H1/VM1. The main changes from the previous version are:

  • The scope of H1/VM1 has been reduced to cover only housing and buildings less than 300 m². Requirements
    applicable for large buildings have been combined into the new Verification Method H1/VM2. To reflect the new scope of the documents and the new document layout, a new introduction and scope has been provided in Part 1. General.
  • Citation of NZS 4218: 2009 has been removed from the document. The relevant content from this standard has been adopted into H1/AS1 with permission from Standards New Zealand.
  • The three-zone climate zone map previously found in NZS 4218 has been updated with a six-zone climate zone map in Appendix C.
  • The minimum R-values previously found in NZS 4218 are replaced with new values and new text in Part 2. Building thermal envelope.
  • References have been revised to include only documents within the scope of H1/AS1 and have been amended to include the most recent versions of NZS 4246 and ALF in Appendix A.
  • Additional references have been added to include BS EN 673, ISO 10077-1 and -2, ISO 10211, ISO 10456, ISO 12631, ISO 13370, and ISO 13789 in Appendix A.
  • The definitions page has been revised to include all defined terms used in this document in Appendix B.
  • The computer modelling method for determining the building energy use has been provided in Appendix D.
  • A new procedure for calculating the construction R-value of slab-on-ground floors has been added in Appendix F.

H1/VM1 (Fifth Edition) will be valid till August 2022, then will be replaced with H1/VM1 (Fifth Edition, Amd 1).

Feedback (https://codehub.building.govt.nz/feedback?backUrl=resources/h1vm1-fifth-edition)