Acceptable Solution E2/AS3: External moisture provisions for concrete and concrete masonry buildings
- Abbreviation
- E2/AS3 (Fourth edition)
- Version
- Fourth edition
- Valid from
- 28/07/2025
- Information provider
- Ministry of Business, Innovation and Employment,
- Information type
- Acceptable Solution,
- Format
- PDF,
Description
E2 External Moisture Acceptable Solution E2/AS3 Fourth Edition provides a compliance pathway for meeting the weathertightness performance requirements of Clause E2 of the New Zealand Building Code, specifically for concrete and concrete masonry buildings.
The scope is limited to buildings within the scope of CP01:2014 and focuses on the performance of the building envelope in preventing external moisture ingress.
It is suitable for buildings using concrete or concrete masonry construction.
The acceptable solution references CP01:2014 and outlines compliance with various E2 clauses related to water shedding, moisture penetration, and construction moisture. The fourth edition introduces a standalone format with a consistent structure.
Scope
This acceptable solution covers external moisture provisions for concrete and concrete masonry buildings. It is limited to buildings within the scope of CP01.
This resource is not cited by any other resources.
Acceptable Solution E2/AS3: External moisture provisions for concrete and concrete masonry buildings
This document is not CITED BY any other resources:
This resource cites:
Acceptable Solution E2/AS3: External moisture provisions for concrete and concrete masonry buildings
This document CITES:
E2/AS3 (Fourth edition) cites Code of Practice for Weathertight Concrete and Concrete Masonry Construction from 14/02/2014