Acceptable Solution C/AS2: Protection from fire for buildings other than Risk Group SH

Abbreviation
C/AS2 (Second edition)
Version
Second edition
Valid from
28/07/2025

Information provider
Ministry of Business, Innovation and Employment,
Information type
Acceptable Solution,
Format
PDF,


Description

C Protection from Fire Acceptable Solution C/AS2 Second Edition provides a compliance pathway for meeting the fire safety requirements of Clauses C1 to C6 of the New Zealand Building Code for buildings other than risk group SH.

Scope

This acceptable solution applies to all risk groups listed in Table 1.1.1.1 except for risk group SH. It covers buildings or parts of buildings where people:

  • a) sleep (SM); and
  • b) are unable to self-evacuate without assistance through requiring special care or treatment, or they are restrained, or their liberties are restricted (SI); and
  • c) congregate, participate in group activities, or where professional services or retail are provided (CA);
  • d) work (WB); and
  • e) store goods and other materials (WS); 
  • f) park vehicles (VP).

Items outside the scope of this document:

Buildings with complex features are outside the scope of this acceptable solution. Complex features include:

  • a) atriums; and
  • b) intermediate floors other than limited area intermediate floors; and
  • c) operating theatres, intensive care units, hyperbaric chambers, delivery rooms, and recovery rooms (SI); and
  • d) recreation and event centres (with tiered seating for more than 2000 people) (CA); and
  • e) buildings more than 20 storeys high; and
  • f) prison buildings.

Buildings that have features for which solutions are not provided within this acceptable solution are also deemed to be complex.

Other than where permitted for risk group SI and for early childhood centres, this acceptable solution allows for an ‘all out’ evacuation strategy. It does not provide features to facilitate a delayed evacuation strategy.

Risk group SI invariably requires a fire safety strategy involving delayed initiation of evacuation and movement to a place of safety within the building. However, this acceptable solution does not provide for building features that would be required for a stay-in-place strategy. This applies to activities such as:

  • a) operating theatres; and
  • b) intensive care units; and
  • c) hyperbaric chambers; and
  • d) delivery rooms; and
  • e) recovery rooms.

The control of hazardous substances is not covered by this acceptable solution and it does not provide for any use, storage or processing of hazardous substances. Compliance with Verification Method F3/VM1 and the Hazardous Substances and New Organisms Act 1996, and the Health and Safety at Work (Hazardous Substances) Regulations 2017 is required where applicable in addition to the requirements of this acceptable solution.

For assistance with locating previous versions, please contact the information provider.
Notes/comments

This acceptable solution is the second edition of C/AS2. The main changes from the previous version are:

  • The format and the layout has been revised to improve clarity.
  • Minor amendments have been made to correct typos, grammar, cross-references, punctuation, wording, and formatting of the document.
  • The acceptable solution now refers to the Building Product Specifications for the fire test methods and specification of building products. As a consequence, references to building product standards have been removed from the acceptable solution.
  • Headings have been consolidated with content reorganised in Part 3. Means of escape, 
    Part 4. Control of internal fire and smoke spread, and Part 5. Control of external fire spread.
  • References have been revised to reflect the documents cited in this acceptable solution.
  • Definitions have been revised to reflect the consequential amendments of citing the Building Product Specifications. 
  • Minor amendments have been made to relocate the modifications to AS/NZS 2918 and AS 1691 from Part 7. Prevention of fire occurring to Appendix D. 
  • Horizontal fire spread tables have been relocated from Part 5. Control of external fire spread to a new Appendix E.
View on Information Provider website Download this resource (PDF, 5.7MB)
For assistance with locating previous versions, please contact the information provider.

This acceptable solution is the second edition of C/AS2. The main changes from the previous version are:

  • The format and the layout has been revised to improve clarity.
  • Minor amendments have been made to correct typos, grammar, cross-references, punctuation, wording, and formatting of the document.
  • The acceptable solution now refers to the Building Product Specifications for the fire test methods and specification of building products. As a consequence, references to building product standards have been removed from the acceptable solution.
  • Headings have been consolidated with content reorganised in Part 3. Means of escape, 
    Part 4. Control of internal fire and smoke spread, and Part 5. Control of external fire spread.
  • References have been revised to reflect the documents cited in this acceptable solution.
  • Definitions have been revised to reflect the consequential amendments of citing the Building Product Specifications. 
  • Minor amendments have been made to relocate the modifications to AS/NZS 2918 and AS 1691 from Part 7. Prevention of fire occurring to Appendix D. 
  • Horizontal fire spread tables have been relocated from Part 5. Control of external fire spread to a new Appendix E.
This resource is not cited by any other resources.

Acceptable Solution C/AS2: Protection from fire for buildings other than Risk Group SH

This document is not CITED BY any other resources:

Acceptable Solution C/AS2: Protection from fire for buildings other than Risk Group SH

Description

C Protection from Fire Acceptable Solution C/AS2 Second Edition provides a compliance pathway for meeting the fire safety requirements of Clauses C1 to C6 of the New Zealand Building Code for buildings other than risk group SH.

View on Information Provider website Download this resource (PDF, 5.7MB)
Acceptable Solution C/AS2: Protection from fire for buildings other than Risk Group SH
Description

C Protection from Fire Acceptable Solution C/AS2 Second Edition provides a compliance pathway for meeting the fire safety requirements of Clauses C1 to C6 of the New Zealand Building Code for buildings other than risk group SH.

View on Information Provider website Download this resource (PDF, 5.7MB)