(https://www.mbie.govt.nz/)
(https://www.building.govt.nz/) (https://www.standards.govt.nz/) (https://www.branz.co.nz/)
Resource detail (https://codehub.building.govt.nz/resources/b2as1-amd-12#resource-detail)
Citations (https://codehub.building.govt.nz/resources/b2as1-amd-12#resource-citations)

Acceptable Solution B2/AS1: Durability Applications

View on Information Provider website Download this resource (PDF, 683KB) (https://www.building.govt.nz/assets/Uploads/building-code-compliance/b-stability/b2-durability/asvm/b2-durability-2nd-edition-amendment-12.pdf)
Abbreviation
B2/AS1 (Amd 12)
Amendment
12
Version
Second Edition, Amendment 12
Valid from
28/11/2019

Information provider
Ministry of Business, Innovation and Employment,
Information type
Acceptable Solution,
Format
PDF,


Description

Acceptable Solution B2/AS1 provides a means of compliance with Building Code Clause B2 Durability.Clause B2 confirms the use of materials that will remain functional for the minimum periods specified (5, 15 or ≥50 years).

B2 Durability must always be considered when demonstrating compliance with each of the clauses of the Building Code. In other words, it ensures that a building will continue to satisfy the performance of the Building Code throughout its specified intended life. Under the clause, building materials, components and construction methods are required to be sufficiently durable. They must ensure that the building, without reconstruction or major renovation, continues to satisfy the other functional requirements of the Building Code throughout its life. B2 specifies minimum durability periods building elements must meet with only normal maintenance, being not less than 50, 15 or 5 years.

Scope

Building elements, including materials, components and systems, complying with a publication referenced in the Acceptable Solutions and Verification Methods, satisfy B2 requirements only when the conditions of use stated in the publication and Acceptable Solutions and Verification Methods prevail.

Previous versions:
B2/AS1 (Amd 11) (Second Edition, Amendment 11) (https://codehub.building.govt.nz/resources/b2as1-amd-11)
B2/AS1 (Amd 10) (Second Edition, Amendment 10) (https://codehub.building.govt.nz/resources/b2as1-amd-10)
B2/AS1 (Amd 9) (Second edition, Amendment 9) (https://codehub.building.govt.nz/resources/b2as1-amd-9)
B2/AS1 (Amd 8) (Second edition, Amendment 8) (https://codehub.building.govt.nz/resources/b2as1-amd-8)
B2/AS1 (Amd 7) (Second edition, Amendment 7) (https://codehub.building.govt.nz/resources/b2as1-amd-7)
For assistance with locating previous versions, please contact the information provider.
Notes/comments

Amendment 12 of B2 includes Alterations on:

  • page 14 B2/AS1 2.2.1
View on Information Provider website Download this resource (PDF, 683KB) (https://www.building.govt.nz/assets/Uploads/building-code-compliance/b-stability/b2-durability/asvm/b2-durability-2nd-edition-amendment-12.pdf)
B2/AS1 (Amd 11) Amendment 11 Second Edition, Amendment 11 (https://codehub.building.govt.nz/resources/b2as1-amd-11)
B2/AS1 (Amd 10) Amendment 10 Second Edition, Amendment 10 (https://codehub.building.govt.nz/resources/b2as1-amd-10)
B2/AS1 (Amd 9) Amendment 9 Second edition, Amendment 9 (https://codehub.building.govt.nz/resources/b2as1-amd-9)
B2/AS1 (Amd 8) Amendment 8 Second edition, Amendment 8 (https://codehub.building.govt.nz/resources/b2as1-amd-8)
B2/AS1 (Amd 7) Amendment 7 Second edition, Amendment 7 (https://codehub.building.govt.nz/resources/b2as1-amd-7)
For assistance with locating previous versions, please contact the information provider.

Amendment 12 of B2 includes Alterations on:

  • page 14 B2/AS1 2.2.1
Feedback (https://codehub.building.govt.nz/feedback?backUrl=resources/b2as1-amd-12)