Verification Method H1/VM3: Energy efficiency of HVAC systems in commercial buildings.
- Abbreviation
- H1/VM3 (First edition)
- Version
- First edition, unamended
- Valid from
- 29/11/2021
- Information provider
- Ministry of Business, Innovation and Employment,
- Information type
- Verification Method,
- Format
- PDF,
Description
The Verification Method H1/VM3 can be used for HVAC systems in commercial buildings. It contains requirements for:
- a) Air conditioning system controls, and
- b) Mechanical ventilation system controls, and
- c) Fans, and
- d) Ductwork insulation and sealing, and
- e) Pumps, and
- f) Pipework insulation, and
- g) Space heating, and
- h) Refrigerant chillers, and
- i) Unitary air conditioning equipment, and
- j) Heat rejection equipment, and
- k) Facilities for energy monitoring, and
- l) Maintenance access.
The Verification Method H1/VM3 is one option that provides a means of establishing compliance with the performance criteria in Building Code clause H1.3.6.
Scope
The Verification Method H1/VM3 does not include requirements for:
- a) HVAC systems that directly cool cold rooms or heat hot rooms (such as in a butcher’s shop, fruit storage rooms or in laboratories); or
- b) HVAC systems that maintain specialised conditions for equipment or processes, where this is the main purpose of the HVAC system.
For these, compliance may be demonstrated using an alternative solution.
This resource is not cited by any other resources.
Verification Method H1/VM3: Energy efficiency of HVAC systems in commercial buildings.
This document is not CITED BY any other resources:
This resource cites:
Verification Method H1/VM3: Energy efficiency of HVAC systems in commercial buildings.
This document CITES:
H1/VM3 (First edition) cites AS/NZS 3823.1.2:2012 Performance of electrical appliances - Airconditioners and heat pumps - Part 1.2: Ducted airconditioners and air-to-air heat pumps - Testing and rating for performance from 29/11/2021
H1/VM3 (First edition) cites AS/NZS 4859.1:2018 Thermal insulation materials for buildings, Part 1: General criteria and technical provisions from 29/11/2021
H1/VM3 (First edition) cites AS/NZS 5263.1.2:2020 Gas appliances - Part 1.2: Gas fired water heaters for hot water supply and/or central heating from 29/11/2021
H1/VM3 (First edition) cites AS 1668.2-2012 The use of ventilation and airconditioning in buildings - Part 2: Mechanical ventilation in buildings from 29/11/2021
H1/VM3 (First edition) cites AS 4254.1-2012 Ductwork for air-handling systems in buildings. Part 1: Flexible duct from 29/11/2021
H1/VM3 (First edition) cites AS 4254.2-2012 Ductwork for air-handling systems in buildings. Part 2: Rigid duct from 29/11/2021
H1/VM3 (First edition) cites AHRI 460:2005 Performance Rating of Remote Mechanical-Draft Air-Cooled Refrigerant Condensers from 29/11/2021
H1/VM3 (First edition) cites AHRI 551/591:2015 Performance Rating of Water-chilling and Heat Pump Water-heating Packages Using the Vapor Compression Cycle from 29/11/2021
H1/VM3 (First edition) cites BS 7190:1989 Method for assessing thermal performance of low temperature hot water boilers using a test rig. from 29/11/2021
H1/VM3 (First edition) cites Commission Regulation (EU) No 547/2012 - Ecodesign requirements for water pumps from 29/11/2021
H1/VM3 (First edition) cites Commission Regulation (EU) No 622/2012 - Ecodesign requirements for glandless standalone circulators and glandless circulators integrated in products from 29/11/2021