Verification Method E1/VM1: Surface Water

This resource is no longer current. E1/VM1 (Amd 12) (First Edition, Amendment 12.),

Abbreviation
E1/VM1 (Amd 10)
Amendment
10
Version
First Edition, Amendment 10
Valid to
3/11/2021
Valid from
1/01/2017

Information provider
Ministry of Business, Innovation and Employment,
Information type
Verification Method,
Format
PDF,


Description

Verification Method E1/VM1 provides a means of compliance with Building Code Clause E1 Surface Water

Scope

This Verification Method is only to be used only if the territorial authority does not have more accurate data available from sophisticated hydrological modelling of the catchment undertaken as part of its flood management plans.

The approach provides a method for verifying that a proposed building will meet the requirements of NZBC E1.1,1 and E1.1.2 in the following circumstances:

a) The catchment area does not exceed 100 ha (but see Paragraph 1.0.6 for soak pits), and

b) The surface water results only from rainfall on the catchment and does not include water frm other sources such as inundation from rivers, lakes or the sea. 

For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

Verification Method E1/VM1: Surface Water

This document is not CITED BY any other resources:

Verification Method E1/VM1: Surface Water

Description

Verification Method E1/VM1 provides a means of compliance with Building Code Clause E1 Surface Water

View on Information Provider website Download this resource (PDF, 1.6MB)
Verification Method E1/VM1: Surface Water

This resource is no longer current. E1/VM1 (Amd 12) (First Edition, Amendment 12.),

Description

Verification Method E1/VM1 provides a means of compliance with Building Code Clause E1 Surface Water

View on Information Provider website Download this resource (PDF, 1.6MB)
This resource cites:

Verification Method E1/VM1: Surface Water

This document CITES:
Feedback