Verification Method E1/VM1: Surface Water
- Abbreviation
- E1/VM1 (Amd 9)
- Amendment
- 9
- Version
- First Edition, Amendment 9
- Valid to
- 30/05/2017
- Valid from
- 14/02/2014
This resource is no longer current. E1/VM1 (Amd 12) (First Edition, Amendment 12.),
- Information provider
- Ministry of Business, Innovation and Employment,
- Information type
- Verification Method,
- Format
- PDF,
Description
Verification Method E1/VM1 provides a means of compliance with Building Code Clause E1 Surface Water
Scope
This Verification Method is only to be used only if the territorial authority does not have more accurate data available from sophisticated hydrological modelling of the catchment undertaken as part of its flood management plans.
The approach provides a method for verifying that a proposed building will meet the requirements of NZBC E1.1,1 and E1.1.2 in the following circumstances:
- a) The catchment area does not exceed 100 ha (but see Paragraph 1.0.6 for soak pits), and
- b) The surface water results only from rainfall on the catchment and does not include water frm other sources such as inundation from rivers, lakes or the sea.
This resource is not cited by any other resources.
Verification Method E1/VM1: Surface Water
This document is not CITED BY any other resources:
This resource cites:
Verification Method E1/VM1: Surface Water
This document CITES:
E1/VM1 (Amd 9) cites AS 3706.1-2003 Geotextiles - Methods of test. Part 1: General requirements, sampling, conditioning, basic physical properties and statistical analysis from 1/12/2000
E1/VM1 (Amd 9) cites Resource Management Act 1991 from 1/12/2000