Updates to plumbing and drainage compliance pathways - Build 200 (2024)

Abbreviation
Updates to plumbing and drainage compliance pathways - Build 200 (2024)
Valid from
1/02/2024

Information provider
BRANZ Limited,
Author
Nick Helm
Information type
BUILD article,
Format
Website, PDF,

Description

Recent updates to the Building Code compliance pathways aim to improve the safety and reliability of Aotearoa New Zealand’s plumbing and drainage systems.

IN NOVEMBER 2023, MBIE published amendments to the Acceptable Solutions and Verification Methods for three plumbing and drainage-related Building Code clauses:

  • G12 Water supplies – requires the safe supply, storage, reticulation and delivery of hot and cold water.
  • G13 Foul water – requires the safe disposal of foulwater to prevent illness and the loss of amenity due to odour and accumulated matter.
  • E1 Surface water – requires buildings and sitework to protect people and property from adverse effects of surface water.

Scope

This article includes:

  • Cited standards
  • G12 Water supplies
    • Lead in plumbing products
    • Pipe materials
  • Cross-connection hazard
    • Containment backflow protection
    • Pipeline identification
    • Safe water temperatures
    • Water supply system components
  • Changes to G13/AS2 for foul water
  • Junctions
  • E1 Surface water
  • Many other changes
For assistance with locating previous versions, please contact the information provider.
View on Information Provider website Download this resource (PDF, 1.4MB)
For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

Updates to plumbing and drainage compliance pathways - Build 200 (2024)

This document is not CITED BY any other resources:

Updates to plumbing and drainage compliance pathways - Build 200 (2024)

Description

Recent updates to the Building Code compliance pathways aim to improve the safety and reliability of Aotearoa New Zealand’s plumbing and drainage systems.

IN NOVEMBER 2023, MBIE published amendments to the Acceptable Solutions and Verification Methods for three plumbing and drainage-related Building Code clauses:

  • G12 Water supplies – requires the safe supply, storage, reticulation and delivery of hot and cold water.
  • G13 Foul water – requires the safe disposal of foulwater to prevent illness and the loss of amenity due to odour and accumulated matter.
  • E1 Surface water – requires buildings and sitework to protect people and property from adverse effects of surface water.

View on Information Provider website Download this resource (PDF, 1.4MB)
Updates to plumbing and drainage compliance pathways - Build 200 (2024)
Description

Recent updates to the Building Code compliance pathways aim to improve the safety and reliability of Aotearoa New Zealand’s plumbing and drainage systems.

IN NOVEMBER 2023, MBIE published amendments to the Acceptable Solutions and Verification Methods for three plumbing and drainage-related Building Code clauses:

  • G12 Water supplies – requires the safe supply, storage, reticulation and delivery of hot and cold water.
  • G13 Foul water – requires the safe disposal of foulwater to prevent illness and the loss of amenity due to odour and accumulated matter.
  • E1 Surface water – requires buildings and sitework to protect people and property from adverse effects of surface water.
View on Information Provider website Download this resource (PDF, 1.4MB)
This resource does not cite any other resources.

Updates to plumbing and drainage compliance pathways - Build 200 (2024)

This resource does not CITE any other resources.
Feedback