Many designers demonstrate that their floor slabs comply with Building Code clause H1 by using Acceptable Solution H1/AS1 or Verification Method H1/VM1. Here are some key points to bear in mind.

There are currently several options available. H1/AS1 and H1/VM1 5th edition, amendment 1, can be used in building consent applications until 26 November 2026. From 27 November only H1/AS1 and H1/VM1 6th edition can be used. 

Scope

This article includes:

  • Demonstrating Code compliance
  • Determining slab R-values
    • Using vertical edge insulation
    • Slab area-to-perimeter ratio
  • Only use new BRANZ House insulation guide
For assistance with locating previous versions, please contact the information provider.
View on Information Provider website
For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

Specifying slab floors that comply with H1

This document is not CITED BY any other resources:

Specifying slab floors that comply with H1

Description

Many designers demonstrate that their floor slabs comply with Building Code clause H1 by using Acceptable Solution H1/AS1 or Verification Method H1/VM1. Here are some key points to bear in mind.

There are currently several options available. H1/AS1 and H1/VM1 5th edition, amendment 1, can be used in building consent applications until 26 November 2026. From 27 November only H1/AS1 and H1/VM1 6th edition can be used. 

View on Information Provider website
Specifying slab floors that comply with H1
Description

Many designers demonstrate that their floor slabs comply with Building Code clause H1 by using Acceptable Solution H1/AS1 or Verification Method H1/VM1. Here are some key points to bear in mind.

There are currently several options available. H1/AS1 and H1/VM1 5th edition, amendment 1, can be used in building consent applications until 26 November 2026. From 27 November only H1/AS1 and H1/VM1 6th edition can be used. 