BU652 Amendments to Acceptable Solutions and Verification Methods for B1 and E2

Abbreviation
BU652
Valid from
3/08/2020

Information provider
BRANZ Limited,
Information type
BRANZ Bulletin,
Format
PDF,

Description

This bulletin highlights some of the key changes to New Zealand Building Code Acceptable Solutions and Verification Methods for clauses B1 Structure and E2 External moisture that have come into effect since 2012. It highlights the amendments introduced in 2019.

Acceptable Solutions and Verification Methods provide a means of demonstrating compliance with the relevant clauses of the New Zealand Building Code (NZBC). It is not mandatory to use Acceptable Solutions and Verification Methods, but if used, building consent authorities (BCAs) and territorial authorities must accept them as providing compliance.

For assistance with locating previous versions, please contact the information provider.
Notes/comments

This Bulletin replaces Bulletin 545(2012) Key changes to B1/AS1 and E2/AS1.

View on Information Provider website Download this resource (PDF, 3.3MB)
For assistance with locating previous versions, please contact the information provider.

This Bulletin replaces Bulletin 545(2012) Key changes to B1/AS1 and E2/AS1.

This resource is not cited by any other resources.

BU652 Amendments to Acceptable Solutions and Verification Methods for B1 and E2

This document is not CITED BY any other resources:

BU652 Amendments to Acceptable Solutions and Verification Methods for B1 and E2

Description

This bulletin highlights some of the key changes to New Zealand Building Code Acceptable Solutions and Verification Methods for clauses B1 Structure and E2 External moisture that have come into effect since 2012. It highlights the amendments introduced in 2019.

Acceptable Solutions and Verification Methods provide a means of demonstrating compliance with the relevant clauses of the New Zealand Building Code (NZBC). It is not mandatory to use Acceptable Solutions and Verification Methods, but if used, building consent authorities (BCAs) and territorial authorities must accept them as providing compliance.

View on Information Provider website Download this resource (PDF, 3.3MB)
BU652 Amendments to Acceptable Solutions and Verification Methods for B1 and E2
Description

This bulletin highlights some of the key changes to New Zealand Building Code Acceptable Solutions and Verification Methods for clauses B1 Structure and E2 External moisture that have come into effect since 2012. It highlights the amendments introduced in 2019.

Acceptable Solutions and Verification Methods provide a means of demonstrating compliance with the relevant clauses of the New Zealand Building Code (NZBC). It is not mandatory to use Acceptable Solutions and Verification Methods, but if used, building consent authorities (BCAs) and territorial authorities must accept them as providing compliance.

View on Information Provider website Download this resource (PDF, 3.3MB)
This resource does not cite any other resources.

BU652 Amendments to Acceptable Solutions and Verification Methods for B1 and E2

This resource does not CITE any other resources.
Feedback