When is a concrete floor slab dry? - Build 112(2009)

Abbreviation
When is a concrete floor slab dry?
Valid from
1/06/2009

Information provider
BRANZ Limited
Information type
BUILD article
Format
Website, PDF

Description

Natural drying of a concrete slab will take several months and its important to ensure fixed floor coverings arent installed too soon.

For assistance with locating previous versions, please contact the information provider.
View on Information Provider website Download this resource (PDF, 520KB)
For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

When is a concrete floor slab dry? - Build 112(2009)

This document is not CITED BY any other resources:

When is a concrete floor slab dry? - Build 112(2009)

Description

Natural drying of a concrete slab will take several months and its important to ensure fixed floor coverings arent installed too soon.

View on Information Provider website Download this resource (PDF, 520KB)
When is a concrete floor slab dry? - Build 112(2009)
Description

Natural drying of a concrete slab will take several months and its important to ensure fixed floor coverings arent installed too soon.

View on Information Provider website Download this resource (PDF, 520KB)
This resource does not cite any other resources.

When is a concrete floor slab dry? - Build 112(2009)

This resource does not CITE any other resources.
Feedback