Tying up those slabs - Build 127(2011)

Abbreviation
Tying up those slabs
Valid from
1/12/2011

Information provider
BRANZ Limited
Information type
BUILD article
Format
Website, PDF

Description

Another change since the Canterbury earthquakes is that all reinforcing in slabs on the ground must now be tied into the foundation wall reinforcing.

For assistance with locating previous versions, please contact the information provider.
View on Information Provider website Download this resource (PDF, 459KB)
For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

Tying up those slabs - Build 127(2011)

This document is not CITED BY any other resources:

Tying up those slabs - Build 127(2011)

Description

Another change since the Canterbury earthquakes is that all reinforcing in slabs on the ground must now be tied into the foundation wall reinforcing.

View on Information Provider website Download this resource (PDF, 459KB)
Tying up those slabs - Build 127(2011)
Description

Another change since the Canterbury earthquakes is that all reinforcing in slabs on the ground must now be tied into the foundation wall reinforcing.

View on Information Provider website Download this resource (PDF, 459KB)
This resource does not cite any other resources.

Tying up those slabs - Build 127(2011)

This resource does not CITE any other resources.
Feedback