Long-stop period clarified (What is "building work"?) - Build 151(2015)

Abbreviation
Long-stop period clarified (What is "building work"?)
Valid from
1/12/2015

Information provider
BRANZ Limited
Information type
BUILD article
Format
Website, PDF

Description

Claims against faulty building work need to be brought within a 10-year long-stop period. Recent court cases have clarified how this defence applies to design work and product manufacturers and suppliers.

For assistance with locating previous versions, please contact the information provider.
View on Information Provider website Download this resource (PDF, 346KB)
For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

Long-stop period clarified (What is "building work"?) - Build 151(2015)

This document is not CITED BY any other resources:

Long-stop period clarified (What is "building work"?) - Build 151(2015)

Description

Claims against faulty building work need to be brought within a 10-year long-stop period. Recent court cases have clarified how this defence applies to design work and product manufacturers and suppliers.

View on Information Provider website Download this resource (PDF, 346KB)
Long-stop period clarified (What is "building work"?) - Build 151(2015)
Description

Claims against faulty building work need to be brought within a 10-year long-stop period. Recent court cases have clarified how this defence applies to design work and product manufacturers and suppliers.

View on Information Provider website Download this resource (PDF, 346KB)
This resource does not cite any other resources.

Long-stop period clarified (What is "building work"?) - Build 151(2015)

This resource does not CITE any other resources.
Feedback