Long-stop period clarified (What is "building work"?) - Build 151(2015)
- Abbreviation
- Long-stop period clarified (What is "building work"?)
- Valid from
- 1/12/2015
- Information provider
- BRANZ Limited,
- Information type
- BUILD article,
- Format
- Website, PDF,
Description
Claims against faulty building work need to be brought within a 10-year long-stop period. Recent court cases have clarified how this defence applies to design work and product manufacturers and suppliers.