2019/065: The refusal to grant a building consent for District Court buildings due to the disputed importance levels.

Abbreviation
2019/065
Valid from
20/12/2019

Information provider
Ministry of Business, Innovation and Employment
Author
Ministry of Business, Innovation and Employment
Information type
Determination
Format
PDF

Description

This determination considers the authority’s purported refusal to grant a building consent for seismic strengthening work because the authority did not agree with the importance level classification proposed by the structural engineer.

The determination discusses whether the subject building should be classified as Importance Level 2 or Importance Level 3 as set out in AS/NZS 1170.0.  This standard is referenced by Verification Method B1/VM1, which is a means of compliance with Building Code Clause B1 Structure. 

For assistance with locating previous versions, please contact the information provider.
View on Information Provider website Download this resource (PDF, 120KB)
For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

2019/065: The refusal to grant a building consent for District Court buildings due to the disputed importance levels.

This document is not CITED BY any other resources:

2019/065: The refusal to grant a building consent for District Court buildings due to the disputed importance levels.

Description

This determination considers the authority’s purported refusal to grant a building consent for seismic strengthening work because the authority did not agree with the importance level classification proposed by the structural engineer.

The determination discusses whether the subject building should be classified as Importance Level 2 or Importance Level 3 as set out in AS/NZS 1170.0.  This standard is referenced by Verification Method B1/VM1, which is a means of compliance with Building Code Clause B1 Structure. 

View on Information Provider website Download this resource (PDF, 120KB)
2019/065: The refusal to grant a building consent for District Court buildings due to the disputed importance levels.
Description

This determination considers the authority’s purported refusal to grant a building consent for seismic strengthening work because the authority did not agree with the importance level classification proposed by the structural engineer.

The determination discusses whether the subject building should be classified as Importance Level 2 or Importance Level 3 as set out in AS/NZS 1170.0.  This standard is referenced by Verification Method B1/VM1, which is a means of compliance with Building Code Clause B1 Structure. 

View on Information Provider website Download this resource (PDF, 120KB)
This resource does not cite any other resources.

2019/065: The refusal to grant a building consent for District Court buildings due to the disputed importance levels.

This resource does not CITE any other resources.
Feedback