2010/143: The issue of a notice to fix for two decks with tiles installed over membrane systems to a house

Abbreviation
2010/143
Valid from
23/12/2010

Information provider
Ministry of Business, Innovation and Employment
Information type
Determination
Format
PDF

Description

This determination arose from the decision of the authority to refuse to issue a code compliance certificate and to issue a notice to fix for alterations to a house because it was not satisfied that elements of the building work complied with certain clauses of the Building Code.

The authority's concerns relate to the lack of access to the membrane underlying the tiled areas to the decks of the house.

The matter determined was whether the authority was correct in its decision to refuse to issue a code compliance certificate and to issue a notice to fix for the building work; in regard to the compliance of the tiled deck floors only.

It was considered whether the tiled deck areas as installed to two decks on the house complied with Clause E2 External Moisture and Clause B2 Durability of the Building Code.

For assistance with locating previous versions, please contact the information provider.
View on Information Provider website Download this resource (PDF, 98KB)
For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

2010/143: The issue of a notice to fix for two decks with tiles installed over membrane systems to a house

This document is not CITED BY any other resources:

2010/143: The issue of a notice to fix for two decks with tiles installed over membrane systems to a house

Description

This determination arose from the decision of the authority to refuse to issue a code compliance certificate and to issue a notice to fix for alterations to a house because it was not satisfied that elements of the building work complied with certain clauses of the Building Code.

The authority's concerns relate to the lack of access to the membrane underlying the tiled areas to the decks of the house.

The matter determined was whether the authority was correct in its decision to refuse to issue a code compliance certificate and to issue a notice to fix for the building work; in regard to the compliance of the tiled deck floors only.

It was considered whether the tiled deck areas as installed to two decks on the house complied with Clause E2 External Moisture and Clause B2 Durability of the Building Code.

View on Information Provider website Download this resource (PDF, 98KB)
2010/143: The issue of a notice to fix for two decks with tiles installed over membrane systems to a house
Description

This determination arose from the decision of the authority to refuse to issue a code compliance certificate and to issue a notice to fix for alterations to a house because it was not satisfied that elements of the building work complied with certain clauses of the Building Code.

The authority's concerns relate to the lack of access to the membrane underlying the tiled areas to the decks of the house.

The matter determined was whether the authority was correct in its decision to refuse to issue a code compliance certificate and to issue a notice to fix for the building work; in regard to the compliance of the tiled deck floors only.

It was considered whether the tiled deck areas as installed to two decks on the house complied with Clause E2 External Moisture and Clause B2 Durability of the Building Code.

View on Information Provider website Download this resource (PDF, 98KB)