2009/024: Determination regarding the code compliance of the roof membrane to a new building
- Abbreviation
- 2009/024
- Valid from
- 3/04/2009
- Information provider
- Ministry of Business, Innovation and Employment
- Information type
- Determination
- Format
Description
This determination arises from the decision of the authority to refuse to issue an amendment to the building consent for the substitution of roof and deck membranes to a new building because it is not satisfied that the membrane systems comply with Clause E2 of the Building Code.
The matters for determination in terms of section 177(a) and 177(b)(vi) are:
- Whether the roof and deck membranes as installed on the building comply with Clause E2 External Moisture and Clause B2 Durability of the Building Code.
- Whether the authority was correct in its decision to refuse amend the building consent.