Repairing and rebuilding houses affected by the Canterbury earthquakes - Part E

Abbreviation
Repairing and rebuilding houses affected by the Canterbury earthquakes - Part E
Version
Updated 29/05/2018
Valid from
1/12/2012

Information provider
Ministry of Business, Innovation and Employment,
Information type
Guidelines,
Format
PDF,

Description

Part E addresses the special conditions required for the repair and rebuild of one and two storey multi-unit buildings (MUBs), and in particular situations involving the replacement of only part of the block. There are many of these units in Christchurch, often in the eastern parts of the city. All technical categories are covered with specific solutions provided for TC3.

Scope

This guidance applies to single and double storey MUBs. For practical reasons it has not been possible to cover all potential multi-unit building arrangements. To cover the most common building arrangements, this guidance addresses attached units built in a straight line. The concepts developed in this guidance should also be applicable to other multi-unit configurations not specifically within the scope of this document but will depend on case-specific circumstances.

For assistance with locating previous versions, please contact the information provider.
View on Information Provider website Download this resource (PDF, 1.5MB)
For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

Repairing and rebuilding houses affected by the Canterbury earthquakes - Part E

This document is not CITED BY any other resources:

Repairing and rebuilding houses affected by the Canterbury earthquakes - Part E

Description

Part E addresses the special conditions required for the repair and rebuild of one and two storey multi-unit buildings (MUBs), and in particular situations involving the replacement of only part of the block. There are many of these units in Christchurch, often in the eastern parts of the city. All technical categories are covered with specific solutions provided for TC3.

View on Information Provider website Download this resource (PDF, 1.5MB)
Repairing and rebuilding houses affected by the Canterbury earthquakes - Part E
Description

Part E addresses the special conditions required for the repair and rebuild of one and two storey multi-unit buildings (MUBs), and in particular situations involving the replacement of only part of the block. There are many of these units in Christchurch, often in the eastern parts of the city. All technical categories are covered with specific solutions provided for TC3.

View on Information Provider website Download this resource (PDF, 1.5MB)
This resource does not cite any other resources.

Repairing and rebuilding houses affected by the Canterbury earthquakes - Part E

This resource does not CITE any other resources.
Feedback