Description

This bulletin outlines the key requirements from E2/AS1 and NZS 3604:2011 Timber-framed buildings to provide adequate clearance between building materials, floor levels and the outside ground or paving levels.

Scope

The bulletin covers:

  • what are ground clearances
  • problems caused by inadequate ground clearances
  • Building Code requirements
  • reasons given for inadequate ground clearances
  • design and construction requirements
  • remedying existing buildings
  • claddings below ground
  • providing level access.
For assistance with locating previous versions, please contact the information provider.
Notes/comments

This bulletin replaces Bulletin 353 Ground clearances.

View on Information Provider website
For assistance with locating previous versions, please contact the information provider.

This bulletin replaces Bulletin 353 Ground clearances.

This resource is not cited by any other resources.

BU570 Ground clearances

This document is not CITED BY any other resources:

BU570 Ground clearances

Description

This bulletin outlines the key requirements from E2/AS1 and NZS 3604:2011 Timber-framed buildings to provide adequate clearance between building materials, floor levels and the outside ground or paving levels.

View on Information Provider website
BU570 Ground clearances
Description

This bulletin outlines the key requirements from E2/AS1 and NZS 3604:2011 Timber-framed buildings to provide adequate clearance between building materials, floor levels and the outside ground or paving levels.