2017/088: Code-compliance of a facade system proposed for remediation work to an apartment building

Abbreviation
2017/088
Valid from
22/12/2017

Information provider
Ministry of Business, Innovation and Employment
Author
Ministry of Business Innovation and Employment
Information type
Determination
Format
PDF, Website

Description

This determination considered the compliance of a replacement façade system to an existing 5-storey building.

The facade system incorporated high-pressure laminate panels fixed to an aluminium frame creating a 50mm wide cavity between the panels and the lined timber-framed wall behind.

The authority had concerns about the facade system’s ability to perform with respect to preventing the spread of fire over the external cladding.

The determination considered the compliance of the original facade system, and as modified in response to the determination’s initial findings.

For assistance with locating previous versions, please contact the information provider.
Download this resource (PDF, 329KB) View on Information Provider website
For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

2017/088: Code-compliance of a facade system proposed for remediation work to an apartment building

This document is not CITED BY any other resources:

2017/088: Code-compliance of a facade system proposed for remediation work to an apartment building

Description

This determination considered the compliance of a replacement façade system to an existing 5-storey building.

The facade system incorporated high-pressure laminate panels fixed to an aluminium frame creating a 50mm wide cavity between the panels and the lined timber-framed wall behind.

The authority had concerns about the facade system’s ability to perform with respect to preventing the spread of fire over the external cladding.

The determination considered the compliance of the original facade system, and as modified in response to the determination’s initial findings.

Download this resource (PDF, 329KB) View on Information Provider website
2017/088: Code-compliance of a facade system proposed for remediation work to an apartment building
Description

This determination considered the compliance of a replacement façade system to an existing 5-storey building.

The facade system incorporated high-pressure laminate panels fixed to an aluminium frame creating a 50mm wide cavity between the panels and the lined timber-framed wall behind.

The authority had concerns about the facade system’s ability to perform with respect to preventing the spread of fire over the external cladding.

The determination considered the compliance of the original facade system, and as modified in response to the determination’s initial findings.

Download this resource (PDF, 329KB) View on Information Provider website
This resource does not cite any other resources.

2017/088: Code-compliance of a facade system proposed for remediation work to an apartment building

This resource does not CITE any other resources.
Feedback