Getting closure - Build 144(2014)

Abbreviation
Getting closure
Valid from
1/10/2014

Information provider
BRANZ Limited
Information type
BUILD article
Format
Website, PDF

Description

The BRANZ helpline was recently asked how the base of a drained and vented cavity should be constructed for a timber or concrete pile construction. Let's take a look.

For assistance with locating previous versions, please contact the information provider.
View on Information Provider website Download this resource (PDF, 757KB)
For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

Getting closure - Build 144(2014)

This document is not CITED BY any other resources:

Getting closure - Build 144(2014)

Description

The BRANZ helpline was recently asked how the base of a drained and vented cavity should be constructed for a timber or concrete pile construction. Let's take a look.

View on Information Provider website Download this resource (PDF, 757KB)
Getting closure - Build 144(2014)
Description

The BRANZ helpline was recently asked how the base of a drained and vented cavity should be constructed for a timber or concrete pile construction. Let's take a look.

View on Information Provider website Download this resource (PDF, 757KB)
This resource does not cite any other resources.

Getting closure - Build 144(2014)

This resource does not CITE any other resources.
Feedback