BU516 Moisture management in masonry veneer

Abbreviation
BU516(2009)
Valid from
1/10/2009

Information provider
BRANZ Limited,
Information type
BRANZ Bulletin,
Format
PDF,

Description

This bulletin outlines the requirements for the construction of cavities behind masonry veneer (within the scope of E2/AS1) to provide drainage and drying.

Scope

The bulletin covers:

  • cavity design
  • bottom venting and drainage
  • detailing at veneer base
  • top venting
  • windows and doors
  • pipe penetrations
  • finished floor levels.
For assistance with locating previous versions, please contact the information provider.
View on Information Provider website Download this resource (PDF, 2.1MB)
For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

BU516 Moisture management in masonry veneer

This document is not CITED BY any other resources:

BU516 Moisture management in masonry veneer

Description

This bulletin outlines the requirements for the construction of cavities behind masonry veneer (within the scope of E2/AS1) to provide drainage and drying.

View on Information Provider website Download this resource (PDF, 2.1MB)
BU516 Moisture management in masonry veneer
Description

This bulletin outlines the requirements for the construction of cavities behind masonry veneer (within the scope of E2/AS1) to provide drainage and drying.

View on Information Provider website Download this resource (PDF, 2.1MB)
This resource does not cite any other resources.

BU516 Moisture management in masonry veneer

This resource does not CITE any other resources.
Feedback