2019/048: Refusal to issue a certificate of acceptance for plumbing and drainage work associated with a shipping container used as a mortuary
- Abbreviation
- 2019/048
- Valid from
- 30/09/2019
- Information provider
- Ministry of Business, Innovation and Employment
- Information type
- Determination
- Format
Description
This determination considers the authority’s refusal to issue a certificate of acceptance for plumbing and drainage work that was carried out without building consent.
The plumbing and drainage work was installed to convert the shipping container for use as a mortuary and connects to an existing foul water drainage system that services a dwelling on the property, which in turn connects to a septic tank and evapotranspiration bed.