2017/014: Regarding a building consent for the recladding of apartments
- Abbreviation
- 2017/014
- Valid from
- 9/03/2017
- Information provider
- Ministry of Business, Innovation and Employment,
- Information type
- Determination,
- Format
- PDF,
Description
This determination was concerned with the compliance of a panel facade cladding system used in the recladding of two apartments at the top of a multi-level building.
Due to its height, the building fell outside the scope of the Acceptable Solution and Verification Method, and the determination considered the effect of wind pressures likely to be imposed on the cladding system.