2016/026: Determination regarding the compliance of a vapour barrier to a proposed pool house

Abbreviation
2016/026
Valid from
12/07/2016

Information provider
Ministry of Business, Innovation and Employment
Information type
Determination
Format
PDF

Description

In response to the initial application for a building consent, the authority expressed concern about condensation within wall and roof framing resulting from the generation of water vapour from the heated pool.

The designer amended drawings to incorporate a vapour barrier within the structure. However, the authority continued to refuse to issue to grant the building consent unless specialist advice was provided.

The application for this determination arises from the decision of the authority to refuse to grant the building consent for the second stage of the building until it has received sufficient information to be satisfied that the pool house will comply with regard to internal moisture and specifically condensation forming in the wall framing.

The matter to be determined is whether the building as proposed will comply with Clauses G4.3.3(b), B1.3.3(e) and B2.3.1(a) of the Building Code. 

For assistance with locating previous versions, please contact the information provider.
View on Information Provider website Download this resource (PDF, 514KB)
For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

2016/026: Determination regarding the compliance of a vapour barrier to a proposed pool house

This document is not CITED BY any other resources:

2016/026: Determination regarding the compliance of a vapour barrier to a proposed pool house

Description

In response to the initial application for a building consent, the authority expressed concern about condensation within wall and roof framing resulting from the generation of water vapour from the heated pool.

The designer amended drawings to incorporate a vapour barrier within the structure. However, the authority continued to refuse to issue to grant the building consent unless specialist advice was provided.

The application for this determination arises from the decision of the authority to refuse to grant the building consent for the second stage of the building until it has received sufficient information to be satisfied that the pool house will comply with regard to internal moisture and specifically condensation forming in the wall framing.

The matter to be determined is whether the building as proposed will comply with Clauses G4.3.3(b), B1.3.3(e) and B2.3.1(a) of the Building Code. 

View on Information Provider website Download this resource (PDF, 514KB)
2016/026: Determination regarding the compliance of a vapour barrier to a proposed pool house
Description

In response to the initial application for a building consent, the authority expressed concern about condensation within wall and roof framing resulting from the generation of water vapour from the heated pool.

The designer amended drawings to incorporate a vapour barrier within the structure. However, the authority continued to refuse to issue to grant the building consent unless specialist advice was provided.

The application for this determination arises from the decision of the authority to refuse to grant the building consent for the second stage of the building until it has received sufficient information to be satisfied that the pool house will comply with regard to internal moisture and specifically condensation forming in the wall framing.

The matter to be determined is whether the building as proposed will comply with Clauses G4.3.3(b), B1.3.3(e) and B2.3.1(a) of the Building Code. 

View on Information Provider website Download this resource (PDF, 514KB)
This resource does not cite any other resources.

2016/026: Determination regarding the compliance of a vapour barrier to a proposed pool house

This resource does not CITE any other resources.
Feedback