2013/038: The compliance of remedial work proposed for the skillion roofs of a house

Abbreviation
2013/038
Valid from
9/07/2013

Information provider
Ministry of Business, Innovation and Employment
Information type
Determination
Format
PDF

Description

The application for this determination arises from the following: 1-The house was nearing completion in 2011 when water stains were observed on timber match lining beneath the skillion roof. The underlying construction was investigated and found to differ from the building consent drawings; 2-Following negotiation during 2012, the builder submitted a proposal to the authority for approval for remedial work to be carried out as an amendment to the building consent; 3-The authority has sought a determination on whether the proposed roof repairs will comply with certain clauses of the Building Code (Schedule 1, Building Regulations 1992). The matter to be determined is therefore whether the proposed roof repairs to the house comply with Clause B2 Durability, Clause E2 External Moisture and Clause E3 Internal Moisture of the Building Code.

For assistance with locating previous versions, please contact the information provider.
View on Information Provider website Download this resource (PDF, 247KB)
For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

2013/038: The compliance of remedial work proposed for the skillion roofs of a house

This document is not CITED BY any other resources:

2013/038: The compliance of remedial work proposed for the skillion roofs of a house

Description

The application for this determination arises from the following: 1-The house was nearing completion in 2011 when water stains were observed on timber match lining beneath the skillion roof. The underlying construction was investigated and found to differ from the building consent drawings; 2-Following negotiation during 2012, the builder submitted a proposal to the authority for approval for remedial work to be carried out as an amendment to the building consent; 3-The authority has sought a determination on whether the proposed roof repairs will comply with certain clauses of the Building Code (Schedule 1, Building Regulations 1992). The matter to be determined is therefore whether the proposed roof repairs to the house comply with Clause B2 Durability, Clause E2 External Moisture and Clause E3 Internal Moisture of the Building Code.

View on Information Provider website Download this resource (PDF, 247KB)
2013/038: The compliance of remedial work proposed for the skillion roofs of a house
Description

The application for this determination arises from the following: 1-The house was nearing completion in 2011 when water stains were observed on timber match lining beneath the skillion roof. The underlying construction was investigated and found to differ from the building consent drawings; 2-Following negotiation during 2012, the builder submitted a proposal to the authority for approval for remedial work to be carried out as an amendment to the building consent; 3-The authority has sought a determination on whether the proposed roof repairs will comply with certain clauses of the Building Code (Schedule 1, Building Regulations 1992). The matter to be determined is therefore whether the proposed roof repairs to the house comply with Clause B2 Durability, Clause E2 External Moisture and Clause E3 Internal Moisture of the Building Code.

View on Information Provider website Download this resource (PDF, 247KB)
This resource does not cite any other resources.

2013/038: The compliance of remedial work proposed for the skillion roofs of a house

This resource does not CITE any other resources.
Feedback