2010/080: Refusal to issue a building consent for remedial work to an existing house with a code compliance certificate

Abbreviation
2010/080
Valid from
2/09/2010

Information provider
Ministry of Business, Innovation and Employment
Author
Ministry of Business, Innovation and Employment
Information type
Determination
Format
PDF

Description

This determination arose from a decision by the authority to refuse to grant a building consent for remedial work to the monolithic wall cladding of an existing house with a code compliance certificate, because it considered it had insufficient information to enable it to be satisfied on reasonable grounds that compliance with the Building Code would be achieved.

Specifically, the authority cited that it could not be satisfied that compliance with Building Code clauses B1 Structure, B2 Durability, E2 External moisture, E3 Internal moisture, F1 Hazardous agents on site, and H1 Energy efficiency would be achieved by the proposed remedial work.

The matter determined was whether the authority was correct to refuse to issue a building consent for the proposed remedial work.

For assistance with locating previous versions, please contact the information provider.
View on Information Provider website Download this resource (PDF, 0KB)
For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

2010/080: Refusal to issue a building consent for remedial work to an existing house with a code compliance certificate

This document is not CITED BY any other resources:

2010/080: Refusal to issue a building consent for remedial work to an existing house with a code compliance certificate

Description

This determination arose from a decision by the authority to refuse to grant a building consent for remedial work to the monolithic wall cladding of an existing house with a code compliance certificate, because it considered it had insufficient information to enable it to be satisfied on reasonable grounds that compliance with the Building Code would be achieved.

Specifically, the authority cited that it could not be satisfied that compliance with Building Code clauses B1 Structure, B2 Durability, E2 External moisture, E3 Internal moisture, F1 Hazardous agents on site, and H1 Energy efficiency would be achieved by the proposed remedial work.

The matter determined was whether the authority was correct to refuse to issue a building consent for the proposed remedial work.

View on Information Provider website Download this resource (PDF, 0KB)
2010/080: Refusal to issue a building consent for remedial work to an existing house with a code compliance certificate
Description

This determination arose from a decision by the authority to refuse to grant a building consent for remedial work to the monolithic wall cladding of an existing house with a code compliance certificate, because it considered it had insufficient information to enable it to be satisfied on reasonable grounds that compliance with the Building Code would be achieved.

Specifically, the authority cited that it could not be satisfied that compliance with Building Code clauses B1 Structure, B2 Durability, E2 External moisture, E3 Internal moisture, F1 Hazardous agents on site, and H1 Energy efficiency would be achieved by the proposed remedial work.

The matter determined was whether the authority was correct to refuse to issue a building consent for the proposed remedial work.

View on Information Provider website Download this resource (PDF, 0KB)
This resource does not cite any other resources.

2010/080: Refusal to issue a building consent for remedial work to an existing house with a code compliance certificate

This resource does not CITE any other resources.
Feedback