2006/098: Refusal of a code compliance certificate for a straw bale building with a plastered cladding system

Abbreviation
2006/098
Valid from
16/10/2006

Information provider
Ministry of Business, Innovation and Employment
Information type
Determination
Format
PDF

Description

The dispute for determination is whether the territorial authority's decision to decline to issue a code compliance certificate for a 3-year-old house because it was not satisfied that the plastered straw bale cladding to the walls of the house complied with clauses B2 Durability and E2 External Moisture of the Building Code is correct. The questions to be determined are: Issue 1: Whether the plastered straw bale cladding as installed to the walls of the building complies with the Building Code (see sections 177 and 188 of the Act). Issue 2: Whether the cladding is able to comply with clause B2 of the Building Code, considering the particular risks and special durability considerations that apply to the type of construction used in this house

For assistance with locating previous versions, please contact the information provider.
View on Information Provider website Download this resource (PDF, 138KB)
For assistance with locating previous versions, please contact the information provider.
This resource is not cited by any other resources.

2006/098: Refusal of a code compliance certificate for a straw bale building with a plastered cladding system

This document is not CITED BY any other resources:

2006/098: Refusal of a code compliance certificate for a straw bale building with a plastered cladding system

Description

The dispute for determination is whether the territorial authority's decision to decline to issue a code compliance certificate for a 3-year-old house because it was not satisfied that the plastered straw bale cladding to the walls of the house complied with clauses B2 Durability and E2 External Moisture of the Building Code is correct. The questions to be determined are: Issue 1: Whether the plastered straw bale cladding as installed to the walls of the building complies with the Building Code (see sections 177 and 188 of the Act). Issue 2: Whether the cladding is able to comply with clause B2 of the Building Code, considering the particular risks and special durability considerations that apply to the type of construction used in this house

View on Information Provider website Download this resource (PDF, 138KB)
2006/098: Refusal of a code compliance certificate for a straw bale building with a plastered cladding system
Description

The dispute for determination is whether the territorial authority's decision to decline to issue a code compliance certificate for a 3-year-old house because it was not satisfied that the plastered straw bale cladding to the walls of the house complied with clauses B2 Durability and E2 External Moisture of the Building Code is correct. The questions to be determined are: Issue 1: Whether the plastered straw bale cladding as installed to the walls of the building complies with the Building Code (see sections 177 and 188 of the Act). Issue 2: Whether the cladding is able to comply with clause B2 of the Building Code, considering the particular risks and special durability considerations that apply to the type of construction used in this house

View on Information Provider website Download this resource (PDF, 138KB)
This resource does not cite any other resources.

2006/098: Refusal of a code compliance certificate for a straw bale building with a plastered cladding system

This resource does not CITE any other resources.
Feedback