Save

BU592 Concrete slab-on-ground floors

Abbreviation
BU592
Valid from
01/12/2015

Information provider
BRANZ Limited
Information type
BRANZ Bulletin
Format
PDF, Hard copy

Description

This bulletin outlines the specifications and levels of workmanship required to minimise cracking in residential concrete slab-on-ground floors.

Scope

The bulletin covers:

  • concrete supply
  • compaction
  • finishing
  • curing
  • concrete strength and durability
  • shrinkage reinforcement
  • shrinkage control joints
  • shrinkage control joint spacing.
For assistance with locating previous versions, please contact the information provider.
Notes/comments

This bulletin updates and replaces Bulletin 372 Durability and crack control in domestic concrete floor construction.

View on Information Provider website
For assistance with locating previous versions, please contact the information provider.

This bulletin updates and replaces Bulletin 372 Durability and crack control in domestic concrete floor construction.

This resource is not cited by any other resources.

BU592 Concrete slab-on-ground floors

This document is not CITED BY any other resources:

BU592 Concrete slab-on-ground floors

Description

This bulletin outlines the specifications and levels of workmanship required to minimise cracking in residential concrete slab-on-ground floors.

View on Information Provider website
BU592 Concrete slab-on-ground floors
Description

This bulletin outlines the specifications and levels of workmanship required to minimise cracking in residential concrete slab-on-ground floors.

View on Information Provider website
This resource does not cite any other resources.

BU592 Concrete slab-on-ground floors

This resource does not CITE any other resources.
Save
Feedback